SV63 backplane main line project Solution > Transportation logistics > SV63 backplane main line project

Product application site

The main line of the bottom plate is planned to produce two types of models, SV63-1/SV63-2, and the production capacity is designed to be 15JPH (204 seconds/unit). The entire production line has a total of 13 stations, including 1 elevator station, 4 automatic stations, and 5 One manual station, one manual CO2 welding station, one transition station, and one rework station.